Want create site? Find Free WordPress Themes and plugins.

Sustainability Overview

Water and Waste Water System
Zero waste discharge by treating 100% of the wastewater generated to tertiary standards for non-potable and industrial use. Smart metering and SCA have been implemented to minimise loss.

Solid Waste Management
Provisions are in place for 100% collection of solid waste and recycling of biodegradable solid waste to be treated for use as compost and to generate energy.

Storm Water Management and Rain Water Harvesting
Systems are in place to capture and utilise storm water runoff and the rain water harvesting system is implemented through an open earthen canal, which will allow aquifier recharge and reuse of water for irrigation.

Power Management
24/7 uninterrupted power supply provided. Smart grid, smart metering and monitoring has been deployed to minimise any loss. Policies to implement generation of renewable energy are in place.

Green Dholera

Dholera will be an industrial city & no City is complete without its residents.

Economic development & Industrial growth will generate employment within DSIR in the coming years and therefore, a significant demand for housing will be created.

Total employment in Dholera Industrial City including direct & indirect employment is estimated to be more than 800,000 people which will mean a resident population of more than 2 million people.

A gross area of 24000 acres over all the 3 phases has been reserved for non-industrial development including residential, commercial, recreational, healthcare, educational, etc. while the immediate development phase will have a gross non-industrial area of 1550 acres that is approx. 28% of the total area. Development of the non-industrial area will fulfil the living, learning, recreational & healthcare requirement of the residents of Dholera Industrial City.

 

Residential land use table

Source: Sanctioned Development Plan Report, DSIRDA

http://dholerasir.com/DP-Report-1.aspx

Environment Clearance

  • EC for Infrastructure Construction obtained from MoEF
  • All units to apply for EC (Public Hearing exempted) to GPCB / MOEF as per applicable guidelines
  • All units to apply for “Consent to Establish” & “Consent to Operate” to GPCB

Did you find apk for android? You can find new Free Android Games and apps.